EXCAVATING:
1. EXCAVATING SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF LOCAL BUILDING DEPARTMENT AND AS REQUIRED.
CONCRETE, FOOTINGS AND FOUNDATIONS:
1. ALL FOOTINGS SHALL BEAR ON UNDISTURBED SOIL OR APPROVED COMPACTED FILL WITH A SOIL BEARING CAPACITY OF 3000PSI.  ALL FOOTINGS SHALL EXTEND A MINIMUM DEPTH OF 3’6” BELOW FINISHED GRADE OR AS INDICATED ON THE BLUE PRINTS; 8’’ THICK 48” HIGH.
2. THE SUBCONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE PLACING OF ALL SLEEVES IN CONCRETE WALLS FOR THE TELEPHONE, PLUMBING, ELECTRICAL AND MECHANICAL TRADES; IF NEEDED.
    CRAWL SPACE SLAB:
1. INSTALL FOIL WITHIN THE EXCAVATED SOIL.
2. DISTRIBUTE GRAVEL APPROXIMATELY 4” THICK.
3. POUR MINIMUM 2” CONCRETE USING A SIX BAG MIX.
4. DRAIN SYSTEM

PLUMBING:
1. IN THE CRAWL SPACE ONLY (FROM FLOOR BEAMS TO THE SEWER ONLY). THE FIRST FLOOR IS DONE!
2. INSTALL SUMP PUMP.
3. INSTALL ANY REQUIRED GAS LINES.
4. ONE WORKER FOR ONE DAY; CALCULATE THE COST OF ONE WORKER FOR ONE DAY TO FINALIZE CONNECTIONS.
ELECTRICAL:
1. PROVIDE ALL LABOR AND MATERIALS FOR A COMPLETE AND FUNCTIONAL ELECTRICAL SYSTEM TO THE HOUSE; CONNECTING ELECTRICAL SERVICE AND METER BOX.
2. CONNECT ELECTRICAL FUSE BOXES TO THE POLE ONLY.
3. ONE WORKER FOR ONE DAY; CALCULATE THE COST OF ONE WORKER FOR ONE DAY TO FINALIZE CONNECTIONS.
CRANE AND OPERATOR:
1. PROVIDE WAGES FOR THE CRANE AND OPERATOR PER HOURLY, DAILY OR PER PROJECT (MY PREFERRED OPTION).

BLUE PRINTS/FLOOR PLANS.
SITE DEVELOPMENT PLAN